BG16RFPR001-2.004-2469-C01
Construction of a Photovoltaic Power Plant (with batteries) under item 16 of Annex 4.1 for self-consumption at the hotel complex “Oasis Del Mare”, owned by OASIS TOUR AD
177549112 Ministry of Innovation and Digital Transformation
01.06.2026
01.06.2026
01.06.2027
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), South-East (BG34), Burgas (BG341), Tsarevo, Tsarevo
