BG06RDNP001-4.018-0055-C03
Construction of a rooftop photovoltaic power plant for the production of electricity with an installed peak power of 122.32 kWp and a nominal output power of 100 kW for the own needs of the meat processing enterprise "DMN KOMERS" Ltd., town of Sliven.
EZFRSR ==> Rural Development Programme
831909905 MINISTRY OF AGRICULTURE AND FOOD
20.06.2025
20.06.2025
30.09.2025
Contracted
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), South-East (BG34), Sliven (BG342), Sliven, Sliven
