BG06RDNP001-4.017-0128-C02
Construction of a Photovoltaic Power Plant to supply an electric pump for drip irrigation on 65 acres of Organic Pear Orchard and partial replacement of an existing drip irrigation system.
EZFRSR ==> Rural Development Programme
831909905 MINISTRY OF AGRICULTURE AND FOOD
23.06.2025
23.06.2025
30.09.2025
Contracted
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South Central (BG42), Haskovo (BG422), Harmanli, Rogozinovo
