BG06RDNP001-4.012-1657-C01
Construction of a storage building for preparation and storage of own production. Photovoltaic system with batteries is utilized for own consumption.
EZFRSR ==> Rural Development Programme
831909905 MINISTRY OF AGRICULTURE AND FOOD
03.02.2023
03.02.2023
15.06.2025
Terminated (termination date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), North Central (BG32), Silistra (BG325), Dulovo, Chernolik
