Programme: Rural Development Programme

Planning region: All

Description

The project investment includes:
- delivery and installation of technological equipment
In essence, the investment includes
1 VII with automatic control 1500 kg / shift
2 Dosing, cutting and packaging equipment for buckets and polymer packaging with detachable pasteurization module - up to 4500 kg / change
3 Fruit peeler
4 Dryer
3 Passer machine
4 Fruit press
5 Pasteurizer, move with disassembled dispenser Run in box
1 Glucose fructose syrup tank and control panel
2 Metal detector, movable
3 Electric steam generator
4 Extruder with degreasing and dehydration module - up to 200 kg per hour
According to the technological project, a separate cycle for the production of Concentrated Pasta and Fruit Juice is fully established, as it contains:
- upgrading of RES to the existing supply for electricity and hot water through a Modular System for processing of residual biomass for production of hot water and electricity with the possibility of storage in more batteries.
1 Solar module - PVC up to 130 kW
2 Modular Residual Biomass Processing System
Activities
Activity Contracted Amount Reported Amount
Управление на проекта: Изготвяне на Междинни и Окончателни отчети 20 451.68 33 233.97
Изготвяне на маркетингова стратегия: Събиране на информация - Стратегическо и Оперативно планиране 10 829.16 0.00
Доставка и монтаж на Технологично и Допълнително оборудване: Доставка и монтаж на Технологично и Допълнително оборудване 1 446 418.14 841 954.58

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.