Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 77 540 TREES
Български

Programme: Rural Development Programme

Planning region: All

Description

The subject of this project is the degeneration of a greenhouse for year-round cultivation of vegetables (tomatoes and / or cucumbers) in greenhouse conditions while creating optimal climatic conditions. For this purpose, a greenhouse with polyethylene coating with a built-up area of ​​6777m2 will be built. The greenhouse will be equipped with modern irrigation and control systems - food system, drip irrigation system, micro-sprinkler irrigation system, manual irrigation system, climate control system and additional equipment to create optimal climatic conditions for plants.
Growing vegetables (tomatoes and / or cucumbers) in greenhouses has the following advantages:
- a more favorable environment is created, which is isolated from the external climatic conditions
- allows to create an ideal microclimate for plant development;
- high-quality equipment is introduced in the greenhouses, with which to automate the whole process to the maximum extent.
Activities
Activity Contracted Amount Reported Amount
Изграждане на оранжерия: СМР на оранжерия по одобрен инвестиционен проект 374 551.01 0.00
Инсталация за производство на енергия от ВЕИ: Изграждане на Инсталация за производство на енергия от ВЕИ 168 331.66 0.00
електронно управление на микроклимата, прецизно дигитално напояване, торене и растителна защита: Изграждане на иновативна/автоматизирана система за електронно управление на микроклимата, прецизно дигитално напояване, торене и растителна защита 400 448.24 0.00
Обслужваща технологична пътека : Изграждане на Обслужваща технологична пътека 21 631.33 0.00

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.