Description

the project will allow the farmer to improve his way of working, to introduce new ways of working, which in turn will reduce the costs of production and increase the quality of the produced products. By optimizing the work process and introducing new durable material assets into the production capacity, the amount of natural resources that are used to produce a unit of output will also be reduced, which will directly have a positive impact on the environment. The purchase of the feed kitchen will restructure and optimize the work processes for food preparation, it will be possible to control food and feed and this will lead to an increase in biosecurity and disease prevention. The capacity of the provided forage kitchen meets the needs of the livestock facility.
Activities
Activity Contracted Amount Reported Amount
Закупуване на материални и не материални активи, които допринасят за опазване на компонентите на околната среда, включително за намаляване на вредните емисии и отпадъци: Внедряването на новa земеделска техника, машини, съоръжения и екипировки за подготовка храна за животните в животновъдния обект, водещи до ускорено пренасочване и развитие на Земеделското Стопанство на основата на нови цифрови и технологични решения. Земеделския производител се нужде от подкрепа за осъществяване на необходимите инвестиции за модернизация. Получаването на помощта ще се отрази положително на производителността на Дружеството и конкурентоспособност му и ще се подготви за справяне с нарастващите екологични изисквания. 50 495.19 50 495.18

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.