Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 74 889 TREES
Български

Programme: Rural Development Programme

Planning region: All

Description

The investment proposal includes activities on the construction of an existing building in a workshop for the production of metal structures.
Supply and installation of technological equipment.
Once the above has been realized, the company will create conditions for production of:
reels
farms
metal columns - capitals
fastening parts (strips)
The cites will be obtained after processing of metal profiles and steel sheets.
The technological process involves metalworking for which the respective machines are provided:
- abcant
- guillotine
- welding apparatus and welding table
- Gas-oxygen CNC machine with cutting table
- a bridge crane with a lifting capacity of up to 3200 kilograms
Activities
Activity Contracted Amount Reported Amount
реконструкция на производствена сграда: СМР по реконструкция на съществуваща стопанска сграда в цех за производство на метални конструкции, както следва: части "Архитектура", "ВиК", ОВИ, "Електро". 94 414.23 106 093.07
СМР вертикална планировка: Строително монтажни дейности по изграждане на вертикална планировка с площадкови мрежи /ВиК външно/ /Електро външно/ 138 214.18 94 414.23
Доставка и монтаж на технологично оборудване: Технологичният процес е свързан обработка на металите, за което са предвидени съответните машини: - абкант - гилотина - заваръчен апарат и заваръчна маса - Газо-кислороден CNC апарат с маса за рязане - мостов кран с товароподемност до 3200 килограма 167 365.45 167 365.45

Notes:

System.Threading.Tasks.Task`1[Microsoft.AspNetCore.Html.HtmlString] Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).