Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 77 506 TREES
Български

Programme: Rural Development Programme

Planning region: All

Description

For the implementation of the Investment Intent it is planned to build a new building in the property of the Assignor, located in the village of Alvanovo, municipality. Targovishte. The building will be located in the free-standing property. The terrain around the building will have adjacent sites for loading and unloading of raw materials and shipping of finished products. The building will be on one level, at an elevation of ± 0.00.It will have a steel load-bearing structure built on a reinforced concrete platform. The enclosing and partition walls will be made of thermal insulation "sandwich" panels with appropriate insulation. The roof structure will be made of metal capitals mounted transversely to the supporting frames. The roofing will also be made of thermal insulation sandwich panels.
None

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.