Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 74 902 TREES
Български

Programme: Rural Development Programme

Planning region: All

Description

The project will be implemented by "ECOTOURS STAROSEL" Ltd. - an agricultural producer, registered in the Municipal Service "Agriculture" - Asenovgrad, Plovdiv region. The project concerns the purchase of technological equipment for a greenhouse with hydroponic drip cultivation of strawberries in PI 06029.330.058, UNDER the CCCR OF THE VILLAGE OF BOYANTSI, MUNICIPALITY OF ASENOVGRAD, PLOVDIV REGION. The subject of this project is an innovative, existing greenhouse, an administrative and service building to it. The main activity is growing strawberries using hydroponic technology, which includes drip irrigation and climate control, in order to create optimal conditions for plant development and complete isolation from the external environment. The project will be implemented in a land plot PI 06029.330.058 in the land of the village. Boyantsi, Asenovgrad Municipality, Plovdiv Region, on an area of ​​4792.4 m². The greenhouse is existing, and the project will use ready-made seedlings, and the production cycle will be year-round. The water supply well is also existing and will be used for the needs of the irrigation system. Brief description of the investments under the project proposal
The project includes the following key investments:
1. Automated system for hydroponic strawberry cultivation - total value: 1,059,820 BGN excluding VAT
• Food unit and climate control with a meteorological station
• Galvanized metal gutters - 13,000 m
• Galvanized gutter stands - 2,200 pcs.
• Air circulation fans - 18 pcs.
• Drip irrigation system with 52,000 drippers
• Misting system with 500 nozzles
• Collapsible metal tank – 32 m³
• Thermal screen with shading function
• 13,000 hydroponic bags with coconut substrate
• Picking carts – 4 pcs.
2. LED lighting to support growth – 200 pcs. – total value: 3347.49 BGN excluding VAT
• LED Grow Light LVXD03AE-250
• Spectrum suitable for all phases of plant development
• Control systems, installation and full technical consultation
Activities
Activity Contracted Amount Reported Amount
Изграждане на автоматизиран оранжериен комплекс за отглеждане на зеленчуци: Ще бъе изграден автоматизиран оранжериен комплекс за отглеждане на зеленчуци 368 138.43 0.00
Закупуване на оборудване за автоматизиран оранжериен комплекс за отглеждане на зеленчуци: Ще бъсе закупено оборудване за автоматизиран оранжериен комплекс за отглеждане на зеленчуци 581 884.01 912 819.00

Notes:

System.Threading.Tasks.Task`1[Microsoft.AspNetCore.Html.HtmlString] Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).
System.Threading.Tasks.Task`1[Microsoft.AspNetCore.Html.HtmlString]