The current project proposal includes investments in providing water for large ruminants of meat breeds. The activities envisage the implementation of water-saving technologies in the company's livestock facility. The estimated costs are for the installation of 5 water tanks with a volume of 100 m3, one water tank with a volume of 300 m3. It is planned to install 36 double and 16 single drinkers, all with protection against water freezing. The methodology and organization of implementation of the new technological organization will lead to a reduction in the costs of providing water to the animals, especially in the dry and hot months. When determining the investments included in the project proposal, we took into account the minimum need to provide water for the animals, when raising 110 animals of meat breed. The volume of the built water reservoirs and drinking troughs make it possible to provide water for a period of 35 to 40 days without refilling from the cistern. Drinking bowls are equipped with protection against water freezing. Thus, the chosen technology makes it possible to realize a great saving of water.
Activities
Activity
Contracted Amount
Reported Amount
Закупуване на активи: След направен анализ на необходимостта за осигуряване вода за напояване на животните в животновъдния обект, са определени активите, които са необходими.
245 113.39
210 396.62
Управление: Осъществява контрол по изпълнение на договорите сключени с избраните доставчици
0.00
4 090.33
Notes:
System.Threading.Tasks.Task`1[Microsoft.AspNetCore.Html.HtmlString]
Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN