Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 77 539 TREES
Български

Programme: Rural Development Programme

Planning region: All

Description

The Municipality of Devin is applying under sub-measure 7.2 procedure BG06RDNP001-7.020 - Energy efficiency "Reconstruction, repair, equipment and/or furnishing of municipal buildings in which public services are provided, in order to improve their energy efficiency" with the aim of promoting investments in improving the energy efficiency of the "Radost" kindergarten in the village of Gevren, Devin municipality.
The investment in the renovation of the kindergarten, with the aim of achieving energy-efficient measures, will significantly improve the overall infrastructure of the building fund, through the implementation of the following construction and assembly works:
• Replacement of a heating installation with an energy-efficient heat pump.
• Replacement of existing gutters and downspouts.
• Providing an accessible environment for people with disabilities.
• Replacement of windows and doors.
• Laying thermal insulation on facades and roof.
• Roof repairs.
• Roof repair at the visor over the main entrance.
• Installation of autonomous photovoltaic elements on the roof with accompanying repair and remodeling of the existing electrical installation to include them. The new photovoltaic elements are planned to be installed along one slope of the roof.
Activities
Activity Contracted Amount Reported Amount
Подобряване на техническата инфраструктура в детска градина „Радост“, чрез инвестиции в мерки за енергийна ефективност: Реконструкция и ремонт на общите части на детска градина „Радост“ в село Гьоврен, Община Девин, в т.ч. подмяна на дограмата на сградата, полагане на топлоизолация по фасадите, ремонт и топлоизолиране на покрив и обновяване на козирката над главния вход, внедряване на автономна фотоволтаична централа за собствени нужди 977 701.50 0.00

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.