Description

The three mobile pumps planned for purchase will replace 3 pcs. existing diesel moto pumps, which are highly depreciated and inefficient and with a significantly lower flow rate, which does not allow reaching the required parameters for irrigation. This leads to a very high consumption of water to achieve the required irrigation rate per unit area. By implementing the three new pumps planned for purchase under the project in the irrigation pivot systems, it will be possible to optimally use the water resources needed to irrigate the areas, as this will be achieved by optimizing the watering time, which will lead to a significant reduction in consumption of water used.
Activities
Activity Contracted Amount Reported Amount
Закупуване на три броя мобилни помпи за намаляване потреблението на вода при обезпечаване работата на поливни пивотни системи за производство на царевица: Предвидените за закупуване три мобилни помпи ще заместят три съществуващи дизел мото помпи, които са силно амортизирани и неефективни и със значително по-нисък дебит, което не позволява достигане на необходимите параметри за напояване. Това води до много висок разход на вода за да се постигне необходимата норма за поливане на единица площ. 409 673.64 409 673.65

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.