Planning region: All

Description

he project envisages the construction of an administrative - residential building with a workshop and warehouses with a total area of ​​151.75 square meters. m. s. Slavovitsa. A 30 KW photovoltaic installation for own needs will be installed on the roof of the building. The building will be used for storage and extraction of honey and it is there that the equipment for extraction of honey will be installed. A 45 KW pellet boiler will be built next to the building, with a system for controlling harmful emissions. The project envisages the creation of perennial plantations of lavender 151,844 decares in the land of the village of Karabunar, where an apiary with a capacity of 500 will be positioned. Bee families.Lavender plantations will also be used as a honey crop. An irrigation system with 4 sprinklers for micro-sprinklers is installed on the lavender plantations. Irrigation tanks with insulation and level meter, food unit, solar pumps with autonomous power supply, etc., also subject to investment under this project. The project envisages an apiary to carry out mobile beekeeping. For this purpose, the following investment is envisaged:Vans for 48 eight-frame multi-hull hives with autonomous power supply, video surveillance and lighting equipped with an automatic pollen collection line 7000/3200/2500 Automatic pollen collection line and quantity notification control 1.2kW Pollen conveyor be< Pollen collection containers with quantity control sensor and photovoltaic installation -1.5KW.
None

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.