Programme: Foods 2014-2020

Planning region: All

Description

The project proposal of Kors Fish provides for the modernization of the production complex - a semi-intensive non-system for the cultivation of Balkan trout, which is built in landed property №000061 with EKATE 49949 on the territory of Maglij, representing 2 150 ha of agricultural land / fishpond , located in the Barite area.
The total annual production of fish for consumption in the fish farm is 36,000 kg. Balkan trout / Salmo trutta fario /. The farm is of basin type and has 4 concrete pools with a total area of ​​0.560 decares. The water source of the farm is the Selchanska River, which determines the cold-water temperature regime;
Fish farming technology includes three stages:
- Production of a feed material weighing up to 1 gram
- Growing of a feed material weighing more than 1 gram
- Growing fish for consumption
The investment in the renovation of the farm is complemented by the construction of a place for staffing and recreation and the purchase of the necessary equipment for the successful management of the farm.
Activities
Activity Contracted Amount Reported Amount
Избор на изпълнител и Реконструкция и модернизация на стопанството и Изграждане на място за отдих (8280 лв. част от офертата за СМР): СМР дейности съгласно приложено КСС 92 828.90 92 805.89
Избор на изпълнител и Доставка на технологично оборудване за стопанството: Доставка на необходимото оборудване съгласно приложена оферта 19 236.44 19 236.18
Избор на изпълнител и Доставка на обзавеждане: Доставка на основно обзавеждане за служителите на стопанството съгласно приложена оферта 1 989.53 1 989.53

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.