Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 54 575 TREES
Български

Programme: Environment

Planning region: All

Identification

BG16M1OP002-1.016-0013-C06
Construction of water supply and sewerage infrastructure on the designated territory served by "Water Supply and Sewerage" Ltd. - Stara Zagora
CF ==> Environment
000697371 Ministry of environment and water
15.10.2019
30.10.2019
30.05.2024
In execution (starting date)
Location of Performance
  • Bulgaria, North and South East Bulgaria (BG3), South-East (BG34), Stara Zagora (BG344)

Notes:

Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).