BG16RFPR001-2.004-1714-C01
Improving energy efficiency and the share of RES at STIL PERFECT EOOD through a 150 kW (AC) rooftop photovoltaic power plant for own consumption at the production facility in Asenovgrad
177549112 Ministry of Innovation and Digital Transformation
22.04.2026
22.04.2026
22.04.2027
In execution (starting date)
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South Central (BG42), Plovdiv (BG421), Asenovgrad, Asenovgrad
