BG16RFPR001-2.004-0481-C01
"Increasing the energy independence of the Bulgare Hotel through a local energy storage facility (120 kWh battery with inverter)"
177549112 MINISTRY OF INNOVATION AND GROWTH
27.04.2026
27.04.2026
27.04.2027
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), North-West (BG31), Vratsa (BG313), Vratsa, Vratsa
