Description

The project envisages a 38.07 kWp rooftop photovoltaic system with 61.44 kWh high-voltage battery storage and a heat pump for self-consumption at PISAT-ENGINEERING Ltd.’s administrative and warehouse base in Stara Zagora, “Golesh” quarter. The site is the company’s permanent base; the firm designs, delivers, installs and services fire and life-safety systems, public address/EVAC, hotel and other low-current systems, which requires reliable and predictable power supply. 
bcc.bg
+2
pissat.eu
+2

The investment is behind-the-meter and aims to cover a substantial share of the daytime base load, increase the share of RES and reduce electricity purchased from the grid. Battery storage increases self-consumption and enables peak-shaving, while the heat pump improves building-system energy efficiency. Main activities: design; delivery and installation of PV modules, inverters, mounting structures and protection equipment; integration of high-voltage batteries with BMS and an Energy Management System (EMS); LV grid connection; testing, commissioning and staff training.

Expected results: lower energy costs and carbon footprint; higher RES share in final consumption; improved energy independence and operational resilience of the base; full alignment with the scheme’s objectives on energy efficiency and renewables in enterprises.
None

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.