“AMEK TOYS” OOD is a leading Bulgarian manufacturer of plush toys with an established brand and growing international presence. The production process is electricity-intensive, with main energy consumers including sewing and embroidery machines, compressors, HVAC systems, and lighting. The company already operates a photovoltaic power plant exceeding 200 kW, which supplies a significant share of its energy needs; however the storage will facilitate the utilization of the generated power.

The project foresees the purchase and installation of local battery energy storage systems (BESS) with inverters – 110 kW, designed to work in synergy with the existing PV plant. The goal is to maximize self-consumption of renewable energy, reduce peak loads, and stabilize production processes. The investment will enable shifting midday solar surpluses to morning and afternoon consumption, improving overall energy efficiency and reducing dependence on the grid.

Expected results include:

- increase in self-consumed renewable energy;
- reduction in electricity costs;
- reduced CO₂ emissions;
- greater production stability and lower technological losses.

The investment is fully aligned with the objectives of Procedure BG16RFPR001-2.004, supporting energy efficiency, increased use of renewables, and sustainable industrial competitiveness.
None

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.