Programme: Programme "Competitiveness and Innovation in Enterprises" 2021-2027

Planning region: All

Description

The current project consists of the construction and installation of a photovoltaic power plant for the production of electricity for own needs with a total installed marginal capacity of 65 kWp. The photovoltaic power plant will be installed on the roof of the new wing of the existing building in the village of Vakarel, Ihtiman Municipality, located at 19 "Peyo Yavorov" Street, where we provide the social service "Resident Care" at the "St. George" Residence. The photovoltaic power plant will heat all rooms and premises in the newly built wing with a total area of ​​3,000 sq m. Due to the nature of primary energy, the photovoltaic power plant will operate during daylight hours (daytime). To build the photovoltaic power plant, 104 photovoltaic panels with a power of 620 Wp will be required. The panels will be located on the roof of the new wing of the building and will be connected to one issue 50 kV hybrid inverter. To store electricity, 16 batteries with a capacity of 5.12 kWh, or similar, will be needed. A supporting structure will be delivered and installed: a/ DS part - delivery and installation and b/ AC part - delivery and installation.
An integral part of the total investment will be the project documentation - Design Solution - Structural part and Design Solution - Electrical part with drawings and installation instructions.
None

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.