Domino 4 Ltd. is located in a restaurant in the city of Varna and intends, through the implementation of this project, to increase the energy efficiency of its premises by installing a photovoltaic (PV) power plant. The company aims to reduce electricity consumption, which in turn will lead to a significant reduction in CO₂ emissions. As a result, the project will contribute to enhancing the competitiveness of Domino 4 Ltd. through improved energy efficiency, supporting sustainable growth, reducing energy intensity, lowering production costs, and increasing the environmental compliance of the company’s operations. The significant increase in electricity prices in recent years has disrupted the normal operation of the company. As a non-residential end user, the company faces the prospect of higher energy bills at a time when this could adversely affect its economic recovery and development. Technical Parameters of the Project The project foresees the design and construction of a photovoltaic power plant with an installed capacity of 50 kW, equipped with a battery energy storage system and an inverter system for managing and converting electricity.
None
