Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 73 732 TREES
Български

Programme: Programme "Competitiveness and Innovation in Enterprises" 2021-2027

Planning region: All

Description

Touriststroy - Tsaratsovo Ltd. is a modern enterprise primarily engaged in the production of metal products and sheet metal structures for use in mechanical engineering, instrument-making, and construction (code according to KID-2008: 25.99 "Manufacture of other metal products, not elsewhere classified").
Within the framework of the project, the company plans to increase the energy efficiency of its production by implementing the following investments:
1) THERMAL INSULATION SYSTEM OF SANDWICH PANELS WITH THERMAL INSULATION OF PIR (POLYISOCYANURATE) FOR EXTERNAL WALLS - 385 sq.m. (according to Section 12 "Energy-efficient insulation systems in buildings" of Appendix 4.1 "List of eligible asset categories in the field of energy efficiency and the use of energy from renewable sources");
2) TRANSPARENT ENCLOSURES (WINDOWS) WITH ALUMINUM FRAME AND INTERRUPTED THERMAL BRIDGE - 97.6 sq.m. (according to Section 12 "Energy-efficient insulation systems in buildings" of Annex 4.1 "List of eligible asset categories in the field of energy efficiency and the use of energy from renewable sources");
3) ENERGY-SAVING LUMINAIRES (BEAMS - FLOODLIGHTS) with a power of 100W - 7 pcs. (according to Section 13 "Energy-saving luminaires" of Annex 4.1 "List of eligible asset categories in the field of energy efficiency and the use of energy from renewable sources");
The implementation of new energy-efficient solutions will enhance the energy efficiency of the company's production activities. This will accelerate the qualitative transition to climate neutrality by measurably reducing the carbon footprint and optimizing energy consumption.
The planned investments are entirely consistent with the horizontal principles, according to Art. 9 of Regulation (EU) No. 2021/1060. They also align with the principle of "doing no significant harm" to the environment and achieving climate sustainability, contributing to the ecological transition in the company's activities.
None

Notes:

System.Threading.Tasks.Task`1[Microsoft.AspNetCore.Html.HtmlString] Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).
System.Threading.Tasks.Task`1[Microsoft.AspNetCore.Html.HtmlString]