The project proposal envisages the construction of a photovoltaic power plant (PVPP) with an installed capacity of 56 kW and an energy storage system (battery) with a capacity of 56 kWh, to be installed on the roof of the production facility of Metalstroy Engineering 95 Ltd., located in Montana, 147A “Treti Mart” Blvd. The main purpose of the project is to generate renewable electricity for in-house consumption, thereby reducing the company’s dependence on external energy suppliers and lowering its electricity expenses. The investment will contribute to improved energy efficiency, reduced carbon emissions, and enhanced operational sustainability. The PV system is expected to generate approximately 70,000 kWh of electricity per year, covering about 70–75% of the company’s annual energy consumption. This will result in annual energy cost savings, a reduction of approximately 50 tons of CO₂ emissions per year. By implementing the project, Metalstroy Engineering 95 Ltd. will achieve greater energy independence, enhanced competitiveness