The project aims to increase the energy efficiency of “Stam LTD” OOD through the replacement of the outdated and inefficient air-conditioning system with a new high-efficiency HVAC installation that meets modern standards for energy performance and indoor comfort. As part of the investment, two VRV/VRF air-to-air heat pump systems (each with a capacity of 56 kW) and two heat recovery ventilation units with an air flow rate of 1,500 m³/h will be installed. The new equipment will ensure uniform distribution of heat and fresh air, as well as a significant reduction in energy losses during operation. The implementation of the project will result in an overall reduction of energy consumption by approximately 20–25%, a substantial decrease in CO₂ emissions (around 3.3 tons per year), and lasting financial savings on energy costs. In addition, it will improve the microclimatic conditions and overall quality of the working environment, contributing to higher productivity and comfort for the growing staff.
None
