BG-RRP-4.032-0255-C01
"Construction of a local battery storage power station (BESS) with an installed capacity of 0.9 MW and a storage capacity of 1.8 MWh connected to a photovoltaic power plant with an installed capacity of 2,99 MW."
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
17.02.2025
17.02.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, South-West and South Central Bulgaria (BG4), South Central (BG42), Plovdiv (BG421), Rakovski, Stryama
