Programme: Recovery and Resilience Plan

Planning region: All

Identification

BG-RRP-4.032-0255-C01
"Construction of a local battery storage power station (BESS) with an installed capacity of 0.9 MW and a storage capacity of 1.8 MWh connected to a photovoltaic power plant with an installed capacity of 2,99 MW."
176789460 MINISTRY OF ENERGY
17.02.2025
17.02.2025
31.03.2026
In execution (starting date)
Location of Performance
  • Bulgaria, South-West and South Central Bulgaria (BG4), South Central (BG42), Plovdiv (BG421), Rakovski, Stryama

Notes:

System.Threading.Tasks.Task`1[Microsoft.AspNetCore.Html.HtmlString] Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).