BG-RRP-4.032-0212-C01
Combined project for the construction of a local el. energy storage facility with an installed capacity of 0.2 MW and a minimum capacity of 0.43 MWh, together with a new el. energy production capacity from a PV power plant with a nominal generating capacity of 0.6 MW, located in the X-201 UPI, square 21 according to the current regulatory plan in the village of Staro Oryahovo, region Varna.
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
19.03.2025
19.03.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), North-East (BG33), Varna (BG331), Dolni Chiflik, Staro Oryahovo