BG-RRP-4.032-0227-C01
"Construction of a local energy storage system (ESS) with an installed capacity of 0.4 MW and a storage capacity of 0,932 connected to a photovoltaic power plant with an installed capacity of 1 MW."
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
06.03.2025
06.03.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), North Central (BG32), Ruse (BG323), Ruse, Tetovo
