BG-RRP-4.032-0206-C01
Construction of a co-located Battery Energy Storage System with rated power capacity of 1.715 MW together with a Photovoltaic Power Plant (PvPP) with an installed capacity of 4.2 MW, located in the land with identifier 72624.176.103, town of Dobrich, region Dobrich
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
17.02.2025
17.02.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), North-East (BG33), Dobrich (BG332), Dobrich town, Dobrich
