BG-RRP-4.032-0189-C02
"Construction of a local battery storage power station (BESS) with an installed capacity of 0,240 MW and a storage capacity of 0,480 MWh connected to a photovoltaic power plant with an installed capacity of 0,770 MW."
RRF ==> Recovery and Resilience Plan
176789460 MINISTRY OF ENERGY
06.03.2025
06.03.2025
31.03.2026
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), North-East (BG33), Varna (BG331), Beloslav, Ezerovo
