Programme: Recovery and Resilience Plan

Planning region: All

Description

Delivery, installation and commissioning of 0.200MW new local electric energy storage facilities (LSS) as part of a combined project with 0.400MW renewable energy generation capacity.
The implementation will be carried out in accordance with the conceptual design at the Application stage, with the requirements for the elements of the combined project - HPP and LSS specified therein.
The LSS with a capacity of 200kW and an installed capacity of 491.52 kWh will be located in an existing building that provides a suitable working environment and protection for the battery pack in an indoor space.
The block will be positioned inside the building against the north wall and will occupy an area of 16 square meters.
Activities
Activity Contracted Amount Reported Amount
Доставка и инсталиране на 0.200MW нови локални съоръжения за съхранение на електрическа енергия: Доставка и инсталиране на 0.200MW нови локални съоръжения за съхранение на електрическа енергия(ЛСС), като част от комбиниран проект с 0.400MW производствени мощности от възобновяеми източници в ПИ 07603.502.808 от ЗРП на гр. Бяла, област Русе върху площ от 16.00 кв. м. 209 629.67 0.00

Notes:

System.Threading.Tasks.Task`1[Microsoft.AspNetCore.Html.HtmlString] Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).
System.Threading.Tasks.Task`1[Microsoft.AspNetCore.Html.HtmlString]