Identification

UMIS Number BG-RRP-4.032-0168-C01
Project Name New local electrical energy storage facilities with a capacity of 0.200MW
Beneficiary 117522513 BELSYSTEMS LTD
Funding RRF ==> Recovery and Resilience Plan
Date of the Contract/Order 09.11.2025
Start Date 09.11.2025
End Date 31.03.2026
Status of Implementation of the Contract/Order of the Grant In execution (starting date)
Location of Performance
  • България, Северна и югоизточна България (BG3), Северен централен (BG32), Русе (BG323), Бяла, гр.Бяла

Description

Brief description
Доставка, инсталиране и въвеждане в експлоатация на 0.200MW нови локални съоръжения за съхранение на електрическа енергия(ЛСС), като част от комбиниран проект с 0.400MW производствени мощности от възобновяеми източници.
Изпълнението ще се осъществи при спазване на идеен проект на етап Кандидатстване с посочени в него изисквания към елементите на комбинирания проект- ФЕЦ и ЛСС.
ЛСС с мощност 200kW и инсталиран капацитет 491.52 kWh ще бъде разположен в съществуваща сграда, която осигурява подходяща работна среда и защита на акумулаторния блок в закрито пространство. 
Блокът ще се позиционира вътре в сградата до северната стена и ще заеме 16кв.м. площ.
Activities
  • Activity: Доставка и инсталиране на 0.200MW нови локални съоръжения за съхранение на електрическа енергия: Доставка и инсталиране на 0.200MW нови локални съоръжения за съхранение на електрическа енергия(ЛСС), като част от комбиниран проект с 0.400MW производствени мощности от възобновяеми източници в ПИ 07603.502.808 от ЗРП на гр. Бяла, област Русе върху площ от 16.00 кв. м., Contracted Amount: 209 629.67 , Reported Amount: 0.00

Participating Organizations

Partners None
Contractors
  • Contractor: HAY GROUP Ltd, Contracted Amount*: 209 629.67 , Reported Amount**: 0.00
Subcontractors None
Members of the Consortium None

Notes:

* The projected contract value may be lower than the reported one because of any of the following reasons:

  • For physical person, the contracted value does not include the employer expenses, which are admissible expenses and are accounted under the project
  • The Beneficiary has reported expense only with an invoice without a contract with the selected contractor
  • The beneficiary has reported over again expenses to the MA

** This column represents the amount of costs claimed by the beneficiary

Indicators

Indicator 1 Installed and put into operation new capacities for electricity storage, Measure Unit: MW, Base Value: 0.00 , Target amount: 0.20 , Reached amount: 0.00
Indicator 2 Capacity of the installed storage, Measure Unit: MWh, Base Value: 0.00 , Target amount: 0.49 , Reached amount: 0.00
Indicator 3 Installed and put into operation new capacities for the production of electricity from renewable energy (wind and/or solar energy), Measure Unit: MW, Base Value: 0.00 , Target amount: 0.40 , Reached amount: 0.40

Financial Information

Total Project cost 209 629.68 EUR
Grant 104 814.84 EUR
Self amount 104 814.84 EUR
Total actual amounts paid 0.00 EUR
Percentage of EU co-financing 100.00 %

Financial Corrections

None

Notes:

1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower.

2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment.

Procurements

There are no tender procedures

Notes:

All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN