Programme: Recovery and Resilience Plan

Planning region: All

Description

Delivery, installation and commissioning of 0.400MW of new local electrical energy storage facilities (LSS) as part of a combined project with 0.980MW of renewable generation capacity.
LCCs represent four factory-ready products, each of which is a set of PCS (Power Conversion System) with a nominal charging and discharging power of 0.100 MW and a battery block with a capacity of 0.233 MWh, shaped like a standing metal cabinet. They are placed in a free space in property 15829.78.30 in the village of Golyamo Vranovo, near the BKTP.
Activities
Activity Contracted Amount Reported Amount
Доставка и инсталиране на 0.400MW нови локални съоръжения за съхранение на електрическа енергия: Доставка и инсталиране на 0.400MW нови локални съоръжения за съхранение на електрическа енергия(ЛСС), като част от комбиниран проект с 0.980MW производствени мощности от възобновяеми източници в ПИ 15829.78.30 от ЗРП на с. Голямо Враново, община Сливо поле, област Русе върху площ от 7.56 кв. м. Инсталираният капацитет на ЛСС е поне 0.932MWh. 260 247.57 0.00

Notes:

System.Threading.Tasks.Task`1[Microsoft.AspNetCore.Html.HtmlString] Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).
System.Threading.Tasks.Task`1[Microsoft.AspNetCore.Html.HtmlString]