Identification

UMIS Number BG-RRP-4.032-0205-C02
Project Name New local electrical energy storage facilities with a capacity of 0.400MW
Beneficiary 200625317 NEW ECO ENERGY Ltd
Funding RRF ==> Recovery and Resilience Plan
Date of the Contract/Order 18.02.2025
Start Date 18.02.2025
End Date 31.03.2026
Status of Implementation of the Contract/Order of the Grant In execution (starting date)
Location of Performance
  • България, Северна и югоизточна България (BG3), Северен централен (BG32), Русе (BG323), Сливо поле, с.Голямо Враново

Description

Brief description
Доставка, инсталиране и въвеждане в експлоатация на 0.400MW нови локални съоръжения за съхранение на електрическа енергия(ЛСС), като част от комбиниран проект с 0.980MW производствени мощности от възобновяеми източници.
ЛСС представляват четири броя фабрично готово изделие, всяко от които се комплект от PCS (Power Conversion System) с номинална мощност на зареждане и на разреждане 0,100 МW и батериен блок с капацитет 0,233 МWh, оформено като стоящ металeн шкаф. Поставят се в свободно място в имот 15829.78.30 в с. Голямо Враново,  в близост до БКТП.
Activities
  • Activity: Доставка и инсталиране на 0.400MW нови локални съоръжения за съхранение на електрическа енергия: Доставка и инсталиране на 0.400MW нови локални съоръжения за съхранение на електрическа енергия(ЛСС), като част от комбиниран проект с 0.980MW производствени мощности от възобновяеми източници в ПИ 15829.78.30 от ЗРП на с. Голямо Враново, община Сливо поле, област Русе върху площ от 7.56 кв. м. Инсталираният капацитет на ЛСС е поне 0.932MWh., Contracted Amount: 260 247.57 , Reported Amount: 0.00

Participating Organizations

Partners None
Contractors
  • Contractor: "DATA SYST"LTD, Contracted Amount*: 259 360.00 , Reported Amount**: 0.00
Subcontractors None
Members of the Consortium None

Notes:

* The projected contract value may be lower than the reported one because of any of the following reasons:

  • For physical person, the contracted value does not include the employer expenses, which are admissible expenses and are accounted under the project
  • The Beneficiary has reported expense only with an invoice without a contract with the selected contractor
  • The beneficiary has reported over again expenses to the MA

** This column represents the amount of costs claimed by the beneficiary

Indicators

Indicator 1 Installed and put into operation new capacities for electricity storage, Measure Unit: MW, Base Value: 0.00 , Target amount: 0.40 , Reached amount: 0.00
Indicator 2 Capacity of the installed storage, Measure Unit: MWh, Base Value: 0.00 , Target amount: 0.93 , Reached amount: 0.00
Indicator 3 Installed and put into operation new capacities for the production of electricity from renewable energy (wind and/or solar energy), Measure Unit: MW, Base Value: 0.00 , Target amount: 0.98 , Reached amount: 0.98

Financial Information

Total Project cost 260 247.57 EUR
Grant 130 123.78 EUR
Self amount 130 123.79 EUR
Total actual amounts paid 0.00 EUR
Percentage of EU co-financing 100.00 %

Financial Corrections

None

Notes:

1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower.

2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment.

Procurements

There are no tender procedures

Notes:

All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN