Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 73 454 TREES
Български

Programme: Recovery and Resilience Plan

Planning region: All

Description

The project envisages the supply, installation and commissioning of a Local Electricity Storage Facility with an installed capacity of 645kW and a battery farm with a total capacity of 1376kWh, in combination with a photovoltaic power plant for the production of electricity from renewable sources with a total output active alternating current power of the production component from renewable sources - 1375kW in Land with identifier 39668.65.37, located in the land of the village of Krepost, the town of Germite, commune. Dimitrovgrad, region Haskovo
Activities
Activity Contracted Amount Reported Amount
Инсталиране на локално съоръжение за съхранение на електрическа енергия (ЛСС) с мощност 645 kW и капацитет 1376 kWh: Доставка, монтаж и пускане в експлоатация на Локално съоръжение за съхранение на електроенергия (ЛСС) с инсталирана мощност 645kW и батерийно стопанство с с общ капацитет 1376kWh, в комбинация с фотоволтаична електроцентрала за производство на електроенергия от възобновяеми източници с обща изходяща активна променливотокова мощност на производствения компонент от възобновяеми източници – 1375kW в Поземлен имот с идентификатор 39668.65.37, находящ се в землището на с. Крепост, м. Гермите, общ. Димитровград, обл. Хасково 702 770.69 0.00

Notes:

System.Threading.Tasks.Task`1[Microsoft.AspNetCore.Html.HtmlString] Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).
System.Threading.Tasks.Task`1[Microsoft.AspNetCore.Html.HtmlString]