| UMIS Number | BG-RRP-4.032-0038-C02 |
| Project Name | Installation of a local electrical energy storage facility with a capacity of 645 kW / 1376 kWh to a PV power plant with a capacity of 1375 kW |
| Beneficiary | 204457404 SELECTA MM |
| Funding | RRF ==> Recovery and Resilience Plan |
| Date of the Contract/Order | 08.11.2025 |
| Start Date | 08.11.2025 |
| End Date | 30.06.2026 |
| Status of Implementation of the Contract/Order of the Grant | In execution (starting date) |
| Location of Performance |
|
| Brief description |
Проекта предвижда доставка, монтаж и пускане в експлоатация на Локално съоръжение за съхранение на електроенергия (ЛСС) с инсталирана мощност 645kW и батерийно стопанство с с общ капацитет 1376kWh, в комбинация с фотоволтаична електроцентрала за производство на електроенергия от възобновяеми източници с обща изходяща активна променливотокова мощност на производствения компонент от възобновяеми източници – 1375kW в Поземлен имот с идентификатор 39668.65.37, находящ се в землището на с. Крепост, м. Гермите, общ. Димитровград, обл. Хасково |
| Activities |
|
| Partners | None |
| Contractors |
|
| Subcontractors | None |
| Members of the Consortium | None |
|
Notes: * The projected contract value may be lower than the reported one because of any of the following reasons:
** This column represents the amount of costs claimed by the beneficiary |
|
| Indicator 1 | Installed and put into operation new capacities for electricity storage, Measure Unit: MW, Base Value: 0.00 , Target amount: 0.65 , Reached amount: 0.00 |
| Indicator 2 | Capacity of the installed storage, Measure Unit: MWh, Base Value: 0.00 , Target amount: 1.38 , Reached amount: 0.00 |
| Indicator 3 | Installed and put into operation new capacities for the production of electricity from renewable energy (wind and/or solar energy), Measure Unit: MW, Base Value: 0.00 , Target amount: 1.38 , Reached amount: 0.00 |
| Total Project cost | 702 770.69 EUR |
| Grant | 351 385.34 EUR |
| Self amount | 351 385.35 EUR |
| Total actual amounts paid | 0.00 EUR |
| Percentage of EU co-financing | 100.00 % |
| None | |
|
Notes: 1 The quoted value represents the maximum amount of the imposed financial correction. Depending on the performance of the contract, the actual amount of the deducted financial correction may be lower. 2 A financial correction with a zero total value means that it has been canceled as a result of a court judgment. |
|
| Procedure 1 |
Subject to due process: Доставка, монтаж и пускане в експлоатация на Локално съоръжение за съхранение на електроенергия (ЛСС) с инсталирана мощност 645 kW и батерийно стопанство с общ капацитет 2090 kWh,
Estimated Amount: 697 657.77
|
| Procedure 2 |
Subject to due process: Извършване на технически контрол,
Estimated Amount: 5 112.92
|
Notes:
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN