Indicators
Indicator |
Measure Unit |
Base Value |
Target amount |
Reached amount |
1. Technical conditions enabled for the integration of new 2 500 MW production capacity from renewable sources (wind and solar) into the electricity system |
MW |
1 842.00
|
4 342.00
|
0.00
|
2. Signing of contracts for upgrade, modernization and digitalization of the national transmission systems |
|
No |
No |
No |
3. Increase of net cross-border transmission capacity by 600 MW |
MW |
1 400.00
|
2 000.00
|
0.00
|
4. Technical conditions enabled for the integration of additional 2 500 MW from renewable sources (wind and solar) into the electricity system |
MW |
4 342.00
|
6 342.00
|
0.00
|
5. Increase of net cross-border transmission capacity by additional 600 MW |
MW |
1 400.00
|
2 600.00
|
0.00
|
Notes:
Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN