Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 56 781 TREES
Български

Programme: Rural Development Programme

Planning region: All

Indicators

Indicator Measure Unit Base Value Target amount Reached amount
1. Launch of a tender for the construction of 285 MW production capacity of electricity from renewable sources (wind and solar power) co-located with 75 MW of energy storage systems No No No
2. Launch of a tender for the construction of 285 MW production capacity of electricity from renewable sources (wind and solar power) co-located with 75 MW of energy storage systems No No No
3. Launch of a tender for the construction of 285 MW production capacity of electricity from renewable sources (wind and solar power) co-located with 75 MW of energy storage systems No No No
4. Launch of a tender for the construction of 285 MW production capacity of electricity from renewable sources (wind and solar power) co-located with 75 MW of energy storage systems No No No
5. Launch of a tender for the construction of 285 MW production capacity of electricity from renewable sources (wind and solar power) co-located with 75 MW of energy storage systems No No No
6. Additional new production capacity of electricity from renewable sources (wind and solar power) co-located with electricity storage capacity commissioned Мегават 1 704.00 3 129.00 0.00

Notes:

Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).