Programme: Rural Development Programme

Planning region: All

Indicators

Indicator Measure Unit Base Value Target amount Reached amount
1. Launch of a tender for the construction of 285 MW production capacity of electricity from renewable sources (wind and solar power) co-located with 75 MW of energy storage systems No No No
2. Launch of a tender for the construction of 285 MW production capacity of electricity from renewable sources (wind and solar power) co-located with 75 MW of energy storage systems No No No
3. Launch of a tender for the construction of 285 MW production capacity of electricity from renewable sources (wind and solar power) co-located with 75 MW of energy storage systems No No No
4. Launch of a tender for the construction of 285 MW production capacity of electricity from renewable sources (wind and solar power) co-located with 75 MW of energy storage systems No No No
5. Launch of a tender for the construction of 285 MW production capacity of electricity from renewable sources (wind and solar power) co-located with 75 MW of energy storage systems No No No
6. Additional new production capacity of electricity from renewable sources (wind and solar power) co-located with electricity storage capacity commissioned MW 1 704.00 3 129.00 0.00

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.