Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 77 540 TREES
Български

Programme: Rural Development Programme

Planning region: All

Identification

BG06RDNP001-4.018-0100-C02
Increase in the capacity of an existing photovoltaic installation for electricity production for self-consumption without feeding into the power grid, with an installed capacity of 499.95 kWp, with an additional autonomous photovoltaic power plant of 50.88 kWp (215 kWh storage capacity) and an additional energy storage system of 215 kWh
EZFRSR ==> Rural Development Programme
831909905 MINISTRY OF AGRICULTURE AND FOOD
04.06.2025
04.06.2025
30.09.2025
Contracted
Location of Performance
  • Bulgaria, South-West and South Central Bulgaria (BG4), South Central (BG42), Pazardzhik (BG423), Pazardzhik, Pazardzhik

Notes:

Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is funded by the “Technical Assistance” Programme 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project BG16RFTA001-1.003-0001 “Digital transformation in the management of EU funds” and by the “National Recovery and Resilience Plan”, under Investment C10.I11 “Ensuring an adequate information and administrative environment for the implementation of the Recovery and Resilience Plan”.