The project proposal envisages the construction of a photovoltaic plant / FEC / with a total installed capacity of 151.20 Kwp installed on the roofs of existing buildings in the Fodder Plant - Chirpan. The plant consists of 280 photovoltaic modules with a power of 540 W and three salt inventories with a power of 50 kW.
The FPP will provide electricity for the entire plant - feed mill, and the energy produced by the FPP will be used entirely for its own needs. This will be achieved through an already established energy management system, which will regulate the production of electricity from the FPP and in cases where the current production is more than consumption, it will limit the FPP and will not allow energy to return to the grid.
Activities
Activity
Contracted Amount
Reported Amount
Подобряване на енергийната ефективност в предприятията, в това число използване на енергия от ВЕИ за собствено потребление : Проектното преложение предвижда изграждане на фотоволтаична централа с обща инсталирана мощност 151,20 Kwp монтирана на покривите на съществуващите сгради във Фуражен завод - гр. Чирпан. Централата се състои от 280 броя фотоволтаични модули с мощност 540 W и три броя солани инвентора с мощност 50 kW.
ФЕЦ ще осигури електрическа енергия за цялото предприятие - фуражен цех, като енергията произведена от ФЕЦ ще се използва изцало за собствени нужди. Това ще бъде постигнато чрез вече изградена система за енергиен мениджмънт, която ще регулира производството на електроенергия от ФЕЦ и в случаите когато моментното производството е повече от консумацията, тя ще ограничи ФЕЦ и няма да допусне връщане на енергия в мрежата.
189 600.00
213 983.00