Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 57 332 TREES
Български

Programme: Environment

Planning region: All

Description

Energy-efficient lighting is a priority at both European, national and municipal levels. Street lighting is one of the main components of urban infrastructure and is very important for creating an attractive environment for living, business, and tourism. Artificial lighting creates good base for more activities throughout the night time. Good street lighting is an important prerequisite for the safe movement of motor vehicles/in the night, for the bigger traffic capacity of the street network, for the security and confidence of the pedestrians and limitation of the criminal activities. Citizens' safety is the main task of street lighting in residential areas, covering inner-city streets and places with low traffic intensity. Street lighting is great social benefit for the people but it also represents a significant part of the expenses of the municipality of Straldzha. Reducing the cost of lighting and improving street lighting is a complex and controversial task.
The project proposal consist of the newest technologies – high class LED lamps, lamps that use solar energy as main energy source, system for monitoring of the electrical consumption and systems for regulation of the street lightning. The successful implementation of the project will assure significant energy savings and will greatly increase the quality of life in the municipality of Straldzha. The project for the reconstruction of street lighting systems is indispensable and will contribute to the achievement of the main target of the program reduction of the carbon intensity and increase of the safety of supplied energy by:
•	Increase of the produced energy by RES
•	Improvement of the energy efficiency in the buildings, industry and municipalities 
•	Improvement of the expert capacity of the municipal specialists on the area of renewable energy, energy efficiency and energy management
Activities
Activity Contracted Amount Reported Amount
Управление на проекта/Project management: Дейността е от значение за осигуряването на успешно управление и изпълнение на проекта. Тя ще гарантира целесъобразното и ефективно използване на човешките и финансовите ресурси и ще осигури прозрачно управление, което ще доведе до постигане целите на проекта. Изпълнението на проекта и процесите по създаване на организационна управленска структура са реализирани съгласно Европейските принципи на партньорство. Управлението на проекта ще се ръководи от Екип за управление на проекта, който ще се състои от : ръководител на проекта, технически експерт и счетоводител, подпомаган от експерти от партниращата организация. Екипът е отговорен за цялостното управление и организация на осъществяването на проекта и изпълнява следните функции: определя участниците в проекта и техните роли; обсъжда и оценява резултатите от изпълнението на проекта; изготвя финансови и технически доклади, следи изпълнението на отделните дейности по проекта; осъществява координация с партньора за съвместни дейности; осигурява информация и публичност на дейностите и резултатите по проекта. Управлението ще се осъществява чрез месечни работни срещи, както и извънредни работни срещи при нужда. The activity will contribute for the successful management and implementation of the project. It will guarantee the expedient and efficient use of human and financial resources and will provide transparent management to achieve project objectives. The project implementation and the processes of creating organizational and management structures are executed in compliance with the European cooperation principles. The project management will be done by a project managing team consisting of project manager, technical expert and accountant, assisted by experts from the partner organization. The project managing team is in charge of the entire implementation and organization of project realization and has the following functions: appoints the participants in the project and their roles; discusses and evaluates the project results; prepares the financial and technical reports; supervises the implementation of project activities; implements coordination with the partner for joint activities; renders information to the partner and provides publicity for project activities and results. The project management will be carried out by monthly working meetings, as well as special working meetings when needed. 44 953.20 86 422.65
Организиране и провеждане на кръгла маса в България/Organization of seminar in Bulgaria: Кандидатът ще организира провеждане на тридневна кръгла маса с норвежките партньори. Участниците в събитието ще са представители от партниращите организации общо 12 човека, ангажирани с успешно изпълнение на дейностите по проекта и постигане на заложените резултати.Разглежданите теми се предвиждат да бъдат в следните области: -Тенденции в енергоефективното улично осветление; -Възможности за комбиниране на улично осветление с възобновяеми енергийни източници; -Бъдещо финансиране – чрез примери за публично частни партньорства или финансиране от трети страни; -Представяне на добри практики от страните донори; -Интелигентни градове - начини за превръщане на уличното LED осветление в платформа за по-нататъшно разработване на интелигентни градски услуги. The candidate will organize three-day seminar with the Norwegian partners. The participants in the event will be the representatives of the partner organization - 12 persons engaged with the successful execution of the project's activities and achievement of the results. The topics will cover: - Future development of the energy efficient street lighting - Ways to combine street lighting with renewable energy sources - Future financing possibilities with the help of public-private partnership or third parties financing - Good examples from the donor countries - Intelligent cities - development of the street lighting into basis for the intelligent urban services 6 923.64 6 816.00
Информация и публичност/Visibility and publicity: По време на изпълнението на проекта се предвиждат реализацията на редица дейности за информиране и визуализация на резултатите по проекта. Като основни дейности, свързани с прозрачността и информационното покритие на проекта, се предвиждат: • Пресконференция при стартиране на проекта; • Изработка на 1 бр. временна табела на строителната площадка; • Изработване на 1 бр. постоянна обяснителна табела; • Изработка и поддържане на сайт по проекта ; • Провеждане на заключителна пресконференция During the project implementation a great number of activities are planned, providing information and visualization of the project results. The main activities connected with project visibility and information are the following: - Initial press-conference ; - Installation of one a temporary sign on the construction site; - Installation of one permanent explanatory sign; - Designing and maintaining a project site; - Closing press-conference. 2 014.50 1 950.00
СМР по рехабилитация и модернизация на улично осветление на територията на Община Стралджа/Construction acctivities for the rehabilitation and modernization of street lighting in the municipality of Straldzha: Реконструкция и модернизация на системата за външно изкуствено осветление на територията на Община Стралджа. Целта е да се намали енергийното потребление, посредством прилагане на енергоефективни мерки, при гарантирано прилагане на европейските и национални норми за осветеност на уличната мрежа. Изпълнителят на строително-ремонтните работи, работещ под надзора на Бенефициента, чрез техническия експерт и на експертите на инвеститорския контрол, ще извърши следните дейности: - Доставка на LED осветителни тела, автономни фотоволтаични LED осветителя и рогатки по спецификация - Обезопасяване на работната зона - Демонтаж на стари осветителни тела и рогатки - Монтаж на новите осветители и рогатки - Монтаж на системите за мониторинг и управление - Провеждане на функционални изпитания на готовите системи за улично осветление, съобразно изискванията на ЗУТ Rehabilitation and modernization of the street lighting in Straldzha municipality. The goal is to reduce the energy consumption, with the implementation of energy efficient measures and providing the illumination defined by the regulations. The contractor, under the supervision of the Beneficiary (technical expert from the team) and the experts from the investors control, will execute the following activities: - Delivery of new LED lights, new autonomous PV LED lights and new lamp-brackets - Safety measures in the working zone - Demounting of the old lamps and lamp-brackets - Mounting of the new lamps and lamp-brackets - Mounting of the systems for monitoring and regulation - Execution of test of the complete systems according to the legislation 718 828.80 838 852.59
Строителен надзор /Independent construction supervision : За осъществяване на независим строителен надзор на СМР като част от настоящото проектно предложение ще бъде избран Изпълнител чрез тръжна процедура по реда на ЗОП. Изпълнителят ще извършва контрол и надзор на СМР в съответствие с действащата нормативна уредба. СМР ще бъдат подложени на проверка в количествен и качествен аспект, като своевременно ще се отчита постигнатия ефект и ще се вземат мерки за недопускане на конфликт на интереси. На контрол ще бъде подложен и документооборота. Надзорникът ще изпълнява следните дейности: откриване на строителните площадки, изготвяне и съгласуване на заповедна книга за обекта, присъстване на извършването на СМР и документиране на всички видове скрити работи за обосновка на направените разходи, за което ще издава необходимите актове. При окончателно приключване на отделните подобекти, независимият строителен надзор ще изготви финален доклад, според изискванията на ЗУТ. The contractor of the independent construction supervision of the construction and assembly works as a part of the current project proposal will be chosen through a tender procedure in accordance with the Public Procurement Act. The contractor will carry out control and supervision of the construction works according to the going legislation. The construction works will be verified in quantity and quality aspects. Meanwhile the achieved effect will be measured and measures taken to prevent from conflicts of interest. The document flow will also be controlled. The specificity of the planned construction works will determine whether the construction supervision to start before or together with the implementation of construction and repair works. The supervisor will execute the following activities: opening of the construction sites, preparation and coordination of the site register, attend the implementation of construction works and document all kinds of hidden works for justification of the expenses, as well as issuing the necessary certificates. After the finalization of the separate sub-projects, the independent construction supervision will prepare a Final report in accordance with the Spatial Planning Act. 5 300.00 0.00
Авторски надзор/Author's supervision: Кандидатът ще сключи договор с носителите на авторски права върху техническата документация. Изпълнителят на тази дейност ще упражнява авторски надзор по време на изпълнението на СМР във всички отделни технически части, ще изготвя и подписва всички актове съгласно ЗУТ и Наредба № 3/31.07.2003 г., ще съгласува предлагани изменения чрез свои заповеди, при необходимост ще изготвя екзекутивна документация, участие в приемателна комисия и др. The applicant will sign a contract with the copyright holders of the technical documentation. The contractor of this activity will implement copyright supervision during the execution of the construction works in all technical parts, will prepare and sign all certificates according to the Spatial Planning Act and Regulation №3/31.07.2003, will coordinate the proposed changes through orders, etc. 1 564.66 0.00
Одит/Audit: Изпълнителя на дейността ще извърши детайлна проверка на финансовото изпълнение на проекта и ще изготви одиторски доклад за съответствие на извършените разходи с клаузите на договора за финансиране, правилата и изискванията на програмата и приложимото национално законодателство. The contractor will carry out a detailed verification of the financial implementation of the project and will prepare an audit report for correspondence of the expenditures and the clauses of the grant contract, the rules and requirements of the Program and the applicable national legislation. 4 400.62 4 400.40
Преводачески услуги/Translation services: За изпълнението на дейността ще бъде подписан договор с външен изпълнител, който ще предостави писмен превод и устен превод за изпълнение на дейностите по проекта. For the implementation of the activity, a contract will be signed with an external contractor who will provide written translation and interpretation for the implementation of project activities. 3 129.33 3 000.00

Notes:

Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).