Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 55 107 TREES
Български

Programme: Regions in Growth

Planning region: All

Participating Organizations

None
Contractor legal entity Contracted Amount* Reported Amount**
120552797 DIK LTD 357 478.80 357 478.80
200308719 DV CONSULT BG 3 812.40 3 812.40
177362080 Plejades-Efectiva 73 560.00 80 916.00
204340671 ALEMIX GROUP LTD. 779 726.95 779 726.95
200756124 LIFE ENERGY LTD 4 420.80 4 420.80
205259350 Supervision Engineering 2 400.00 2 400.00
203171211 "PROPRESS" Ltd 22 600.00 22 600.00
120562898 ARHSTROY CONSULT 2 931.86 2 931.86
108507750 ECOINGENERING 3 720.00 3 720.00
202028452 STROITEL BG 9 480.00 9 480.00
202087881 EFECT 1 ltd. 70 392.00 87 990.00
123568073 VOENNO INVALIDNA KOOPERATSIA KORONA 765 192.00 765 179.99
201261261 AUREUS INVEST 547 200.00 547 200.00
123523879 GEODET 45 567.98 49 286.27
202584812 ADVANCE STROY LTD. 186 618.00 232 408.55
201947157 BILDKOM 590 400.00 590 400.00
120526083 DARA - KONTROL LTD 4 174.26 4 174.26
130642168 KOTA-2001 176 400.00 176 061.10
200169162 TALANT M 370 270.93 370 211.28
202737585 SD CONSULT LTD 4 740.00 4 740.00
205106205 EUROLUX 18 Ltd. 144 626.40 144 626.40
203103445 Parentis 12 000.00 12 000.00
203783127 CULVERT 420 301.32 420 301.29
203887890 KRISTIYAN INVEST Ltd. 317 134.08 317 134.08
None
None

Notes:

* The projected contract value may be lower than the reported one because of any of the following reasons:
  • For physical person, the contracted value does not include the employer expenses, which are admissible expenses and are accounted under the project
  • The Beneficiary has reported expense only with an invoice without a contract with the selected contractor
  • The beneficiary has reported over again expenses to the MA
** This column represents the amount of costs claimed by the beneficiary
Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).