Programme: Rural Development Programme

Planning region: All

Description

For the implementation of the Investment Intent it is planned to build a new building in the property of the Assignor, located in the village of Alvanovo, municipality. Targovishte. The building will be located in the free-standing property. The terrain around the building will have adjacent sites for loading and unloading of raw materials and shipping of finished products. The building will be on one level, at an elevation of ± 0.00.It will have a steel load-bearing structure built on a reinforced concrete platform. The enclosing and partition walls will be made of thermal insulation "sandwich" panels with appropriate insulation. The roof structure will be made of metal capitals mounted transversely to the supporting frames. The roofing will also be made of thermal insulation sandwich panels.
None

Notes:

Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).