Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 54 743 TREES
Български

Organization

Identification

Data Export Excel HTML XML Print
Name Address
108507750 ECOINGENERING България, гр.Кърджали, 6600, "Булаир" № 14, бл.14, вх.А, ап.1

List of projects in which the organization is involved as a beneficiary (2)

The organization does not participate in projects as a Partner

List of projects in which the organization is involved as a contractor

Project Name UMIS Number Contracts count Contracts amount
“Renovation and implementation of energy measures in the building of the Regional “Fire Safety and Protection of Population Service” - Zlatograd” BG16RFOP001-2.001-0064-C01 1 4 092.00
„Renovation and implementation of energy efficiency measures in the building of Regional Court Zlatograd and Regional Prosecutor’s Office Zlatograd" BG16RFOP001-2.001-0120-C02 1 5 468.40
“Renovation and implementation of energy efficiency measures in the building of the “Border Police Department” – Zlatograd" BG16RFOP001-2.001-0102-C01 1 1 977.60
Renovation and implementation of energy measures in the building of the Regional Police Department of Zlatograd BG16RFOP001-2.001-0065-C01 1 4 680.00
"Vocational School of Agriculture and Forestry in Kardzhali - attractive educational center for young people" BG16RFOP001-3.002-0033-C01 1 10 740.00
Renovation and reconstruction of educational facilities in the town of Kardzhali BG16RFOP001-1.021-0001-C02 1 47 722.80
“Together in supporting the children of Kardzhali” BG16RFOP001-5.001-0047-C01 4 16 956.00
"Repair and rehabilitation of streets and sidewalks in the town of Kardzhali" BG16RFOP001-1.021-0003-C02 3 36 504.00
"Construction of social housing in the town of Kardzhali" BG16RFOP001-1.021-0002-C02 1 25 320.00
Construction of a composting instalation for separately collected green and biodegradable waste - Municipality of Svilengrad BG16M1OP002-2.005-0010-C03 1 35 000.00
"Together for a dignified life" BG16RFOP001-5.002-0017-C01 1 1 860.00
Improving the energy efficiency of a building of high school "Vasil Levski", Krumovgrad town BG16RFOP001-2.002-0009-C01 1 13 140.00
"Implementation of energy efficiency measures and renovation of multifamily residential buildings–“Stanko and Daniel Peevi”, “Orpheus”, “Mila” and blocks № 174, № 177, № 189, in the town of Zlatograd", with an acronym ZlatownEECO2-1. BG16RFOP001-2.002-0015-C02 2 2 703.83
"Implementation of energy efficiency measures and renovation of multifamily residential buildings–“Anjerovi”, “Darina”, “Iosif Kehaiov”, “Bochukovi-Zlatograd”, “Ariste”, “Spring” and blocks “White house” and №178, in the town of Zlatograd", with an acronym ZlatownEECO2 – 2. BG16RFOP001-2.002-0016-C01 2 9 035.76
"Implementation of energy efficiency measures and renovation of multifamily residential buildings– “Saraliiski”, “Pehlivanovi”, “Hadjievi”, “Zumbul”, “Svatevi” and blocks № 190 and № 195A, in the town of Zlatograd ", with an acronym ZlatownEECO2 – 3. BG16RFOP001-2.002-0017-C02 2 4 285.88
"Implementation of energy efficiency measures and renovation of multifamily residential buildings–“Ahrida22”, “Trakia”, “Victoria house”, “VelikoTurnovo”, “RazTsvet”, “Family house Chaushevi”, “Sinchets”, “Humchevi brothers”, “Gogadjovi”, “Kasabovi family”, “Tekstilski block” in the town of Zlatograd ", with an acronym ZlatownEECO2 – 4. BG16RFOP001-2.002-0031-C02 14 16 047.08
"Reconstruction, equipment and furnishing of sports infrastructure fn the territory of Ardino municipality" BG06RDNP001-7.007-0067-C01 1 2 104.64
"Construction, reconstruction and / or rehabilitation of new and existing streets and side facilities and facilities and their accessories, Ardino, Ardino Municipality" BG06RDNP001-7.001-0084-C02 1 25 316.52
"Reconstruction, rehabilitation and development of streets in the village of Pripek, Dzhebel in Mladost quarter and Bryagovo quarter, municipality of Dzhebel, Kardzhali region and follow-up management at project approval" BG06RDNP001-7.001-0115-C08 1 20 772.16
"Reconstruction, repair, equipment and furnishing of SU" Vasil Levski "- Ardino, Ardino Municipality" BG06RDNP001-7.002-0007-C03 1 46 788.00
"Rehabilitation and reconstruction of the street" Progress "- Part II and" Delyo Voyvoda ", part of the street network in the town of Nedelino, Municipality of Nedelino" BG06RDNP001-7.001-0025-C05 1 20 886.19
"Reconstruction of the SU "Hristo Smirnenski " in the village of Chernoochene, including: modernization and implementation of measures for energy efficiency of the building and landscaping of the yard" BG06RDNP001-7.002-0002-C02 1 21 562.51
"Equipment and furnishing of the adjacent spaces of a building of Sofia University" Vassil Levski "- initial stage, town of Krumovgrad " BG06RDNP001-7.002-0022-C02 1 18 775.86
"Reconstruction and rehabilitation of existing streets and pavement in the town of Momchilgrad". BG06RDNP001-7.001-0053-C03 2 17 872.00
Completion and Reconstruction of the Water Supply and Wastewater collection networks in the Designated Territory, serviced by „ViK“ Ltd., Kardzhali, Bulgaria BG16M1OP002-1.016-0010-C03 1 24 800.00
"Energy efficiency of multi-family residential buildings in Smolyan" BG16RFOP001-1.022-0004-C01 1 3 720.00
Reconstruction and renovation of the yard, playgrounds, facilities and fence of "Hristo Botev" high school, Banite village, Smolyan area. BG06RDNP001-19.091-0002-C03 1 5 398.80
Project №3 "Implementing innovative measures to mitigate and adapt to climate change in municipalities in Bulgaria" BGENVIRONMENT-4.001-0001-C04 1 1 800.00
Construction of a park environment for public use in the town of Zlatograd BG06RDNP001-19.148-0002-C05 1 0.00
"Improvement of a municipal park in the central city part - sq. 25, town of Dzhebel - property with planning area no. 315, sq. 25 according to the plan of the town of Dzhebel municipality of Dzhebel, Kardzhali district / land property with identifier 20746.501. 315/ “ BG06RDNP001-19.028-0003-C04 1 6 840.00
"Restoration, repair and reconstruction of a cult religious temple- a mosque with a madrasa in the village of Dolno Prahovo, Ardino municipality" BG06RDNP001-19.255-0001-C04 2 4 200.00
Reconstruction and rehabilitation of street network, sidewalks, facilities and accessories to them on the territory of Kirkovo Municipality BG06RDNP001-7.001-0016-C03 1 26 319.95
"Construction, equipment and furnishing of the Tourist Information Center in the town of Ardino, Ardino municipality" BG06RDNP001-19.387-0001-C04 1 7 500.00
Disability Support Center, including persons with severe multiple disabilities and their families in Kardzhali Municipality BG05M9OP001-2.061-0010-C05 1 6 000.00
Social inclusion of people with mental disorders and intellectual disabilities BG05M9OP001-2.062-0009-C05 1 6 000.00
"Renovation of a square for public use in the town of Ardino, Ardino municipality" BG06RDNP001-19.626-0002-C02 1 3 800.00
“Construction of “Anton Strashimirov” street, Statsevo village from point 351 to point 367” BG06RDNP001-19.571-0003-C03 1 2 200.00
"Construction of an attractive route for pedestrian and bicycle tourism - alley from the village of Banite to the dam wall of the Mini Hydroelectric Power Plant Banite" - II stage, sub-site: Section from km.0+568.58 to km.0+840" BG06RDNP001-19.262-0001-C02 1 6 600.00
Reconstruction and rehabilitation of part of municipal road KRZ1037 in the land of the town of Ardino and municipal road KRZ2007 passing through the land of the village of Lenishte BG06RDNP001-7.019-0011-C01 1 24 107.96
Modernization and implementation of measures to increase the energy efficiency of the buildings of the "Mitko Palauzov" Kindergarten, Krumovgrad BG-RRP-1.007-0108-C01 2 33 722.92
"Reconstruction and rehabilitation of part of the street network of the city of Kozloduy" BG06RDNP001-7.017-0029-C01 1 41 880.00
Update, incl. measures for energy efficiency and remodeling of the fourth floor, supply of equipment and furniture with a view to reforming the "Home for the Elderly", town of Krumovgrad BG-RRP-11.010-0043-C01 1 48 000.00
"Introduction of energy efficiency measures in two administrative buildings of RDFSCP – Kardzhali /RSFSCP-Ardino and RSFSCP-Podkova/" BG-RRP-4.020-0069-C01 1 10 800.00
"Introduction of energy efficiency measures in three administrative buildings of RDPBZN in Kardzhali" BG-RRP-4.020-0075-C01 1 21 600.00

List of projects in which the organization is involved as a Subcontractor (1)

List of projects in which the organization is involved as a member of the Consortium (12)

Notes:

Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).