Saved trees
UMIS AND ITS USERS CONTRIBUTED TO SAVING 54 600 TREES
Български

Programme: All

Planning region: All

Identification

BG06RDNP001-4.001-0329-C03
Optimization of biological stage of treatment facility for wastewater of “Pilco” Ltd by building of two biobasins while preserving the capacity of treatment facility for wastewater and building a new production building Body 5 to the existing one Body 1 Chicken slaughterhouse.
125041015 PILKO LTD
EZFRSR ==> Rural Development Programme
831909905 MINISTRY OF AGRICULTURE AND FOOD
21.07.2021
21.07.2021
21.07.2024
Contracted
Location of Performance

Notes:

Elements in light blue allow detailed view when selected
All amounts are in Bulgarian lev (BGN) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.
In implementing the project № 0115-CCU-2.1 "Information system for management and monitoring of EU funds in 2014-2020 - UMIS 2020" (BG161PO002-2.1.01-0007-C0001).