BG16RFPR001-2.004-2513-C01
The project envisages the construction of a photovoltaic power plant (PVPP) with an installed capacity of 50 kW, intended for the own needs of the company "P.S. I. Gabrovo" Ltd. The system will provide electricity to power an administrative and warehouse building, reducing the costs of consumption from the network and contributing to the energy independence and sustainability of the enterprise.
177549112 Ministry of Innovation and Digital Transformation
01.06.2026
01.06.2026
01.06.2027
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), North Central (BG32), Gabrovo (BG322), Gabrovo, Gabrovo
