BG16RFPR001-2.004-1837-C01
Construction of a PV system with battery storage to improve energy efficiency and raise the share of RES at METALAGRO JSC
177549112 Ministry of Innovation and Digital Transformation
03.04.2026
03.04.2026
03.04.2027
In execution (starting date)
Location of Performance
- Bulgaria, North and South East Bulgaria (BG3), North-East (BG33), Dobrich (BG332), Dobrich town, Dobrich
