Programme: Programme "Competitiveness and Innovation in Enterprises" 2021-2027

Planning region: All

Description

The project proposal envisages the implementation of energy efficiency measures for the company’s building stock, with the aim of improving energy performance, reducing energy costs, and enhancing indoor comfort levels.

The proposed measures include:
Purchase and installation of a heat pump system – introduction of a high-efficiency heating system providing sustainable and environmentally friendly heating with optimized energy consumption.

The conducted energy audit of the building has shown that the current condition of the building and the existing heating system do not meet the required sanitary and hygienic standards for thermal comfort, as the average maintained indoor temperature is below the normative level.

Therefore, the implementation of energy-saving measures is necessary to:

improve the building’s overall energy efficiency;
None

Notes:

System.Threading.Tasks.Task`1[Microsoft.AspNetCore.Html.HtmlString] Elements in light blue allow detailed view when selected
All amounts are in euro (EUR) / 1 EUR = 1,95583 BGN
The project is financed by the Operational Programme "Technical Assistance" and co-financed by the European Union through the European Regional Development Fund.