The project of “Stroitel-Krivodol” Ltd. aims to improve the energy efficiency of the company’s administrative and production infrastructure through the implementation of energy-efficient measures designed to reduce energy consumption, optimize production processes, and limit greenhouse gas emissions. The investment includes: Thermal insulation of the administrative building using an external insulation system made of expanded polystyrene (EPS) with a total area of 566 sq. m, aimed at reducing heat losses, improving thermal comfort, and enhancing the energy performance of the building envelope; Purchase of two new air compressors and two air receivers for the company’s production activities, ensuring more efficient and energy-optimized operation of the technological equipment. The implementation of the project will result in lower energy consumption and costs, improved efficiency of production processes, and a reduction in carbon emissions. The enhanced energy efficiency will contribute to lower energy intensity, a better working environment, and higher competitiveness of the enterprise. The project is fully in line with the objectives of Procedure BG16RFPR001-2.004 “Energy Efficiency and Use of Energy from Renewable Sources in Enterprises”, contributing to the achievement of national and European energy efficiency goals, sustainable production, and the transition towards a low-carbon economy.
None
